Bantwal, Sep 20, 2023: Traffic was disrupted on the Panemangalore bridge for over an hour on September 19, Tuesday following a serial mishap in which two cars were damaged.
Initially two cars collided head on in the bridge. Soon after two other cars hit the collided cars from behind. Luckily those in the car escaped unhurt. Even a lorry remained stuck on the middle of the road nearby due to technical snag resulting in a long queue of vehicles on either side.
Traffic police had a tough time in ensuring smooth vehicular movement after clearing the roads of the vehicles that met with accident.